Operators and SODICK EDM equipment in an existing workshop photograph

SINKER EDM & WIRE EDM

EDM & Wire EDM.
Reach the detail.
Keep the reference.

For blind cavities, local internal forms and through contours in precision mold components. Reviewed around your drawing, material, datums and surface requirements.

Drawing review · Process routing · Feature inspection

SENLAN / EDM work area · existing library photograph

01 / MACHINING RANGES & EQUIPMENT

Room for the feature.
Focus on the detail.

Start with the recorded machining range, then review the machine, workholding and electrode approach around your drawing. Blind forms and through profiles need different access.

Recorded machining ranges

Maximum process range · mm

SINKER EDM

Length

500

Width

500

Height

400

WIRE EDM

Length

1500

Width

1000

Height

1000

These are recorded process-capacity limits, not individual machine-axis travel. Feasibility depends on the part geometry, material, fixtures and access.

Sinker EDM equipment

Equipment images and manufacturer axis-travel references

Also listed: CHENGYANG AL435H 2 units

Quantities: April 2026 equipment register. Travel: manufacturer model specifications.

Axis travel is not the maximum machinable part size. Usable space depends on the electrode, fixtures, tank clearance and access; feasibility is reviewed against your drawing.

02 / FROM FEATURE TO PROCESS

The geometry comes first.
The route follows.

A blind form and a through profile need different access. Explore the machining route, then agree how the finished feature will be located, finished and checked.

EDM requires an electrically conductive workpiece. Hardness alone does not determine the route.

03 / COMPONENT FEATURES

Start with the detail
that matters.

Locate the molding surface, slot or bore on your drawing. Review it together with the fitting faces and the rest of the component.

AI-assisted edits of existing product photographs: background removed and clarity enhanced. Original source photos are linked beneath each image. Images do not establish material, machining route, tolerance or acceptance.

Core features & process boundaries

For core front-end and slender features, show how the forming detail relates to the locating diameter, shoulder or reference face. Agree an inspection approach where direct access is difficult.

A local EDM operation does not imply that the whole component, sleeve or bore is made by EDM. Turning, grinding and subsequent finishing remain drawing-specific route decisions. Manufacturing a mating component does not establish assembled movement, service life or performance.

04 / BEFORE YOUR DRAWING REVIEW

Start with your drawing.
Point out the critical feature.

For a new component, replacement part or repeat batch, mark the EDM feature, its function and the references that control fit.

NDA required? Mention it before sharing detailed drawings.

INCLUDE WITH YOUR RFQ

Drawing & geometry

Current drawing revision, available sections or 3D data, blind or through feature, depth, thickness, minimum radii and entry access.

Material & acceptance

Grade and condition, datums, fitting relationships, surface zones and inspection or reporting requirements.

Quantity & supply scope

Batch size, required date and complete-component or selected-operation scope. For replacement or repeat parts, include the applicable revision and mating context.